shg1025P218
4200CBM TRAIL SUCTION DREDGER (SPLIT HOPPER TYPE)
===============================================
Built in Feb 2021, China
CCS Class
Class notation CSA Split Hopper Dredger; Ice Class B, Dredging
Within R2 CSM BRC
Next SS Feb 2026
L.O.A. 105 m/Breadth 21.00 m
DWT 6300t at Draught 6.1m
Main Diesel EngineMAN/2 X 2750 kW@1000 rpm
Main Generator Siemens 2 X 2400 Kw, 400 V/50 Hz
Auxiliary Gen. Diesel CAT/1 X 874 kW@1500 rpm
Auxiliary Generator CAT/1 X 830 Kw, 400 V/50 Hz
Emergency Gen. Diesel CAT/1 X 164 kW@1500 rpm
Emergency Generator CAT/1 X 143 Kw, 400 V/50 Hz
Bow Thruster 1 X 550 kW
Total Installed Power 6538 kW
Hopper Capacity 4200 m3 Inboard Dredge Pump HK/Motor ABB/2 X 940 kW@1000 rpm
Max. Dredging Depth 26m
Jet Water Pump KSB/Motor ABB/2 X 1000 m3/h; 2 X 400 kW@1200 rpm
Hydraulic System PARKER
Discharging Bottom Doors/ Pumping Ashore/ Rainbowing
Suction Pipe Diameter pi 650 mm
Sailing Speed 12 kn
Complement 14 P
- All details in good faith but without guarantee
|